Selection Of Consulting Services For Supervision And Contract Administration Of Addis Ababa City Water Distribution Scada System Project

Country: ETHIOPIA ,   Year: 2022 - In progress ,   Client: AAWSA, Water and Sanitation Infrastructure Development Division ,   Funding: World Bank ,   Contract Value: 1,077,918.00 USD ,   Tags: Non Revenue Water projects, Water Supply & Water Distribution

view more

RFP

The scope of this consultancy service includes all contract administration and supervision activities required during detail design, supply and installation of the centralized SCADA system. Z&A is responsible for managing the contractor’s activities with the required quality and completion of the project on an agreed timeline.
Z&A is responsible for supervision of the following contractor’s activities which are under the scope of work of the SCADA project:

a) Conducting site audit and reparation of revised bill of quantities for each existing SCADA systems.
b) Design review and producing final working documents.
c) Rehabilitation and maintenance of existing Local Control Stations (LCS) and existing SCADA systems.
d) Implementation of a new Central Control Station to be located at AAWSA Head Office
e) Incorporation of the existing SCADA systems of Gafarsa Water Treatment Plant, Lagadadhi Water Treatment Plant, Akaki well fields ( phases I, II, IIIA, IIIB), Lagadadhi Deep wells Phase I & Phase II, Koye Feche Well field into the new SCADA System.
f) Implementation of new SCADA system for SANF Deep Wells and incorporation into the central SCADA system
g) Detailed design, supply, installation and commissioning of the new Local Control Stations for reservoirs and pumping stations which are part of the water distribution network.
h) Incorporation of the new local control stations into the new central SCADA system.
i) Detail design, supply, installation and integrating into central SCADA of the internal network monitoring stations

The provided services cover the fields of:
Supervision of Construction Activities
Check and approve that the contractor reviewed design documents, drawings, specifications and bills of quantities are in conformity with the contract documents and accepted international standards for the sys-tem.
Approval of Safety, Health and Environment Manual and Quality Management and Control Manual
Review of Contractors’ Work Programme

Inspection and testing of supplied materials and installed equipment, approval of commissioning proce-dures and conducting operational acceptance tests

Advice to the Client on the Progress of Works
Delivery of “As built” drawings to the Client
Transfer of knowledge and skill




SELECTION OF CONSULTING SERVICES FOR NON‐REVENUE WATER REDUCTION STRATEGIC PLAN AND IMPLEMENTATION MECHANISMS & BUSINESS PLAN DEVELOPMENT OF HAWASSA, WOLAITA‐ SODO AND ARBA‐MINCH TOWNS WATER SUPPLY AND SEWERAGE AUTHORITY

Country: ETHIOPIA ,   Year: 2022 - In progress ,   Client: SNNP REGIONAL WATER, MINES AND ENERGY DEVELOPMENT BUREAU ,   Funding: World Bank ,   Contract Value: 1,439,589.00 USD ,   Tags: Non Revenue Water projects

view more

RFP

The Federal Democratic Republic of Ethiopia has received financing from the International Development Association (IDA) for the implementation of Second Urban Water Supply and Sanitation Project (SUWSSP). The Ministry of Water and Energy applied a por-tion of the proceeds of the fund to SNNP Regional State Water, Mines and Energy Development Bureau. The SNNP Region is in the southern part of Ethiopia, its area covers 112,343 km2 and its population is over 15 million. The capital city is Hawassa. The Project focuses on the cities of Hawassa, Wolaita Sodo and Arba Minch and includes two main assignments, each with its own specific objectives and scope of services:
- Develop a Non-Revenue Water (NRW) Reduction Strategic Plan.
- Develop a Business Plan.
As the two assignments feed into each other, the Consultant is executing the two assignments concurrently for each of the three Water Enterprises.
Main City Population (urban and rural) for the three cities are :

Hawassa 492,579 
Arba Minch 167,025 
Sodo 169,578 




CONSULTING SERVICES FOR FEASIBILITY STUDIES AND DETAILED DESIGN OF BENUE RIVER BASIN WATER RESOURCES DEVELOPMENT AND MANAGEMENT PROGRAMME FOR FORMULATION OF TRIMING II

Country: NIGERIA ,   Year: 2022 - In progress ,   Client: FEDERAL MINISTRY OF WATER RESOURCES ,   Funding: World Bank ,   Contract Value: 2,051,117.00 USD ,   Tags: Irrigation

view more

RFP

River Benue is an international river flowing into Nigeria, originating from the highlands of northern Cameroon. The river runs for about 900 km from the border to the confluence with River Niger at Lokoja, Kogi State. River Benue has two major hydrological water provinces in Nigeria - the Upper Benue and the Lower Benue.
The Benue River Basin between the International border with Cameroon and Lokoja is classified as hydrological area III and IV in the Nigerian drainage system classification, covering 98.0 x 103 sq km at the International border of Cameroun and drainage area of 338.2x103 sq km at Lokoja and gross surface water potential of 108.10x109m3/year. The groundwater potential is estimated at 37.9x109m3 /year (JICA MP, 2013).


 The Scope of the Consultancy services are:

I. Update the essential parts of the water resources management data by evaluating available resources spa-tially and temporally for the Benue River Basin “Hydrological Area (HA) 3 and 4” considering the available Water in the Water Resources Master Plans of 1995 and 2013 and their related studies in the past.
II. Draw out the Benue Basin Water Management Plan using most up-to-date state of the art tools, through forecast demand projection of various sub-sectors of water uses, evaluate demand projection for the Benue Basin sub-sectors according to their order of priority: as Municipal and Rural domestic water supply, Irrigation, Hydropower generation schemes, environmental flows, Flood and Drought Control, Inland Navigation and River training, Aquacul-ture and Livestock schemes taking into consideration the socio-environmental risks and needs for downstream.
III. Prepare a Development Plan including a set of possible irrigation and water resources development schemes, including some of which may already be in various stages of implementation.
IV. Project Prioritization and Detailed Designs.




PROVISION OF CONSULTING SERVICES FOR THE FINAL STUDY OF THE CONNECTION PIPELINE OF THE DEKELIA DESALINATION PLANT WITH THE TANKS ON KOKKINOKREMOS HILL AND THE PUMPING STATION STUDY AT DEKELIA DESALINATION PLANT

Country: CYPRUS ,   Year: 2021 - 2022 ,   Client: DEPARTMENT OF WATER DEVELOPMENT ,   Funding: National – E.U. Funds ,   Contract Value: 90,582.00 € ,   Tags: Water Supply & Water Distribution

view more

RFP


 The prolonged drought observed in Cyprus in the last twenty years has resulting in insufficient water storage in the dams that have been constructed. For this reason the Department of Water Development promoted the construction of Units Seawater Desalination in order to make the supply independent of rainfall of drinking water in large urban and tourist centers. The Decelia Desalination Plant was the first plant to be built and operated in 1997, with an initial production capacity of 40,000 m³ of water per day. Its current total capacity is 60,000 m³ of water the day. To deal with the insufficient storage capacity, new reservoirs on the hill of Kokkinokremmos will be constructed with a total capacity of 35,000m³.The water supplied areas are supplied through the central pipeline Choirokotias - Fama-gusta. The pipeline along its longest length is constructed from asbestos cement pipes with diameters of 600 and 650mm while at the height of the Achnas dam there is a small section of the pipeline made of ductile iron pipes di-ameter 700mm. In order to address the operational problems of the pipeline mainly due to its old age, a new water transport pipeline is proposed (TOTAL LENGTH 24.600 m, D.I., DN 900 - 1100) and a pumping station (Q=3394m3/h - Hman=155m), which will connect the Dekelia Desalination Unit with the Tanks at Kokkinokremos.




Provision of Design Consulting Services for the Sewage System in the community of Palodia in Limassol

Country: CYPRUS ,   Year: 2021 - In progress ,   Client: Sewerage Board of Limassol - Amathus (SBLA) ,   Funding: National Funding - EU FUNDING ,   Contract Value: 969,193.00 USD ,   Tags: Sewage and Wastewater

view more


CONSULTING SERVICES FOR INITIAL ASSESSMENT OF SUITABILITY AND DESIGN OF PERFORMANCE-BASED CONTRACTS (PBCS) FOR NON-REVENUE WATER (NRW) REDUCTION FOR A CLUSTER OF FIVE (5) WATER SERVICE PROVIDERS (WSPS)

Country: KENYA ,   Year: 2021 - In progress ,   Client: Water Sector Trust Fund (Ministry of Water, Sanitation, and Irrigation) ,   Funding: World Bank ,   Contract Value: 555,636.00 USD ,   Tags: Non Revenue Water projects, Water Supply & Water Distribution

view more


ΤΑΥ 20/2020 - PROVISION OF CONSULTING SERVICES FOR THE SUPERVISION OF THE CONSTRUCTION OF THE KAMMITSI AND ARCHANGELOS DAM

Country: CYPRUS ,   Year: 2021 - In progress ,   Client: Ministry of Agriculture, Rural Development and Environment - Water Development De-partment ,   Funding: National Funding - EU FUNDING ,   Contract Value: 969,193.00 USD ,   Tags: Construction Supervision Services, Dams & Hydropower

view more

RFP

The overall objective of the assignment is the supervision of the construction works for the Kamitsi and the Archagelos Dams and appurtenant structures in accordance with the International Federation of Consulting Engineers (FIDIC) Conditions of Contract. Both Dams are constructed to prevent flooding events in the wider area of Larnaca
The Kamitsi Dam is a composite structure, with a central concrete spillway and 29,95 m height (from foundation), and Reservoir Capacity of 1.050.000 m3.
The Archagellos Dam is a composite structure, with a central concrete spillway 21.6m height (from foundation), and Reservoir Capacity of 305,000m3




Preparation of a Master Plan for the prioritization of the necessary Immediate Flood protection works on the Island of Thassos

Country: GREECE ,   Year: 2021 - 2022 ,   Client: Ministry of Infrastructure and Transport, Department of Flood Protection and Irri-gation Works ,   Funding: National Funding - EU Funding ,   Contract Value: 164,700.00 USD ,   Tags: Storm Water Networks and Flood prevention

view more


CONSULTANCY SERVICE FOR DEVELOPMENT OF AN INTEGRATED CITY WIDE SANITATION PLAN, FEASIBILITY STUDY AND DETAIL DESIGN OF WASTE WATER MANAGEMENT SYSTEM FOR ARBA MINCH AND SODO TOWNS

Country: ETHIOPIA ,   Year: 2021 - 2023 ,   Client: SNNPRS Water, Mines and Energy Develop-ment Bureau ,   Funding: International Development Association ,   Contract Value: 1,387,982.00 USD ,   Tags: Sewage and Wastewater

view more


TAY 19/2020: Preparation of Flood hazard and Flood risk maps for the revised areas of potentially significant flood risk, revision of Cyprus Flood Risk Management plan, and elaboration of a Strategic Environmental Impact Assessment. implementation of the European Directive 2007/60/EC

Country: CYPRUS ,   Year: 2021 - In progress ,   Client: Ministry of Agriculture, Rural Development and Environment - Water Development De-partment ,   Funding: National Funding – EU Funding ,   Contract Value: 191,900.00 USD ,   Tags: Storm Water Networks and Flood prevention, Water Resources Management

view more