WATER RESOURCES MANAGEMENT OF ACHELOOS RIVER AND MODIFICATIONS OF THE ENVIROMENTAL IMPACT ASSESEMENT STUDY FOR THE DIVERSION OF THE RIVER

Country: GREECE ,   Year: 2006 - 2006 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Resources Management

view more

RFP

The study was carried out in four (4) parts as follows: Part A: "Water Potential" examines the natural availability of water in the Acheloos river basin, Part B: "Water Needs" examines water demand from domestic water supply, irrigation, industry and livestock as well as tourism demand. Also the future demand was assessed based on proposed projects and future development. Part C: "Environmental Issues" where the environmental impacts of the Acheloos diversion were analysed and Part D: "Management Model", where a water management model was configured and calibrated and used to assess the water resource system under different scenarios of water use. The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools. It was elaborated in order to assist the Ministry of Public Works in the implementation of the Water Framework Directive (2000/60). The project includes the following 1) Collection of all the relevant information, 2) Development of an integrated database and presentation of all the relevant data on maps (GIS), 3) Recording of all activities related to water use, 4) Water Demand assessments, 5) Use of simulation software, 6) Analysis of developing projects in the greater area
7) Development of a management model, 8) Gathering of economic information, 9) Development and evaluation of an Economic Model.



EOI

The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools in order to assist the Ministry of Public Works in the implementation of the Water Framework Directive (2000/60). The project includes the following: data collection, development of GIS, water demand assessment, modeling, economic analysis, proposed projects.



DETAILED DESIGN STUDY FOR THE ALLIGNMENT AND REGULATION OF THE PIKRODAFNI STREAM, AGIOS DIMITRIOS MUNICIPALITY, ATHENS, GREECE

Country: GREECE ,   Year: 2004 - 2009 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Storm Water Networks and Flood prevention

view more

RFP

This study concerned the detailed design for the arrangement of the Pikrodafni stream from Ag. Dimitriou Avenue to Vouliagmenis Avenue (1.813 m long).



EOI

This study concerned the detailed design for the realignment of the Pikrodafni stream from Ag. Dimitriou Avenue to Vouliagmenis Avenue (1.813 m long).



FEASIBILITY, PRELIMINARY AND DETAILED DESIGN STUDY ON THE TRANSPORT AND DISTRIBUTION OF WATER FROM RIVER NESTOS TO THE PLAINS XANTHI AND KOMOTINI

Country: GREECE ,   Year: 2004 - 2008 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Irrigation

view more

RFP

The scope of the project is the management of the water resources of the Nestos River catchment. The target is to transfer and distribute irrigation water using the available surface waters and protect the underground resources. The WRM study collected all the available water data to establish the water balance of Nestos river catchment and determine the available quantities for irrigation, hydropower generation and environmental flow requirements. The feasibility study involved a total area of more than 100,000 ha and included also the feasibility design of four dams. Following the above proposals, the Ministry assigned the preliminary design of the water supply and distribution network for the irrigation of Xanthi plain from Nestos river. The total length of the water supply system was approximately 155 km with diameters from D2000 to D400. The area under study was approximately 30,500 ha. Following the preliminary design for the total network of the Xanthi plain irrigation scheme, the Ministry assigned the detailed design of the water supply system for the irrigation of approximately 5,730 ha. The distribution network was also designed.



EOI

The scope of the project is the management of the ground water in the valleys of Ksanthi and Komotini by using the water from Nestos River. All required quantities for irrigation, hydropower and environmental flow were estimated. The feasibility study involved a total area of 100,000 ha, 30,000ha in Ksanthi and included also the feasibility design of four dams. The preliminary and the detailed design of the water supply and distribution network for the irrigation of Xanthi plain covered 5,730 ha.



COMPLETION OF HYDRAULIC STUDIES IN THE NEW HIGH SPEED RAILWAY LINE BETWEEN TOWNS KIATO AND PATRA, PELOPONNESE, GREECE (I.D. 440)

Country: GREECE ,   Year: 2004 - 2009 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Storm Water Networks and Flood prevention

view more

RFP

The detailed design of the water drainage system of the railway line , along with the service road drainage system, the flood protection system from surrounding catchment areas with the necessary hydraulic structures (ditches, culverts, etc). The contract also involved the restoration of the existing irrigation networks. All the above studies were applied to sections from STA. 0+000 to STA. 20+000, STA. 40+000 to STA. 92+500 and STA. 111+500 to STA. 113+000 of the new railway line.



EOI

The detailed design of the water drainage system of the railway line, along with the service road drainage system, the flood protection system from surrounding catchment areas with the necessary hydraulic structures (ditches, culverts, etc). The contract also involved the restoration of the existing irrigation networks. All the above studies were applied to sections from STA. 0+000 to STA. 20+000, STA. 40+000 to STA. 92+500 and STA. 111+500 to STA. 113+000 of the new railway line.



DETAILED DESIGN OF A WWTP INSTALLATION IN SARAKAKIS INDUSTRIAL AREA

Country: GREECE ,   Year: 2004 - 2004 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Sewage and Wastewater

view more

RFP

A separate WWTP installation for disposal and treatment of industrial waste water was designed at the Sarakakis Industrial Area, in Athens.The object of this study involved full hydraulic and structural analysis, calculations, the relevant geotechnical study, the detailed design of the WWTP and preparation of the tender documents. Construction supervision was implemented through out the total construction period and after the completion of the project, initial testing was carried on. WWTP installation was implemented at the backside of the main building of Sarakakis Bro. S.A. and designed to accommodate the higher organic strength and solids content in the water. The installation was designed to serve the 650 employees of the company, one truck painting factory and one truck repair workshop.



EOI

A separate WWTP installation for disposal and treatment of industrial waste water was designed at the Sarakakis Industrial Area, in Athens.The object of this study involved full hydraulic and structural analysis, calculations, the relevant geotechnical study, the detailed design of the WWTP and preparation of the tender documents. Construction supervision was implemented through out the total construction period and after the completion of the project, initial testing was carried on.



TECHNICAL CONSULTANT FOR ASSISTANCE OF SERVICE IN THE PLANNING, STUDIES AND CONSTRUCTION OF WORKS FOR WATER SUPPLY OF ATHENS AND OTHER WORKS

Country: GREECE ,   Year: 2004 - 2010 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Supply & Water Distribution

view more

RFP

The contract involved the following studies and services for the water supply modernization of Athens network:
1) Increase the technical and institutional capacity of the Client in managing the water supply system of the greater Athens area, consisting of an aqueduct of about 300 km long, 2) Upgrading, modeling and redesigning of the Unified Aqueduct of Athens, 3) Development of the Water Supply Master Plan of the Greater Area of Athens 4) Feasibility study for the completion of the aqueduct Marathona – Yliki – Mornos (section Klidi – Dafnoula), 5) Feasibility study for the additional aqueduct from the exit of Kithaironas tunnel up to Acharnes D2000, 6) Completion of the detailed study of the last part of the repaired chlorination aqueduct in Helidonou area and construction of new bypass, 7) Feasibility study for the construction of a chlorination reservoir and a pumping station for water transfer from lake Marathonas in the region Helidonous, Acharnes, Athens, 8) Water Resources Management study for the Evinos river basin and for the total area of Etoloakarnania Prefecture and Water Resources Management study for Mornos river basin and for the total area of Fokida Prefecture,9) Environmental studies for all the above and hygiene education training programs for the Service.



EOI

The contract provided technical assistant to the client regarding the water supply of greater Athens area, about 300 km long. During the services the following activities were conducted: Water Supply Master Plan and Model, feasibility study and detailed design of several subsystems of the network, Water Resources Management study of Etoloakarnania and Fokida Prefectures, Environmental studies and hygiene education training programs for the Service, increase the institutional capacity of the Client.



DEVELOPMENT OF SYSTEM AND TOOLS FOR WATER RESOURCES MANAGEMENT OF THE WATER DISTRICTS OF ATTIKI, STEREA ELLADA, EPIROUS AND THESSALIA DISTRICTS

Country: GREECE ,   Year: 2003 - 2008 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Resources Management

view more

RFP

The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools. It is elaborated in order to assist the Ministry of Development in the implementation of the Water Framework Directive (2000/60). The project includes the following: a. Collection of all the relevant environmental, hydrological and hydro geological information, b. Development of an integrated database and the presentation of all the relevant data in maps (GIS),c. Recording of all activities related to water use d. Use of simulation software (MIKE BASIN & MIKE SHE), e. Water demand assessments and management,f. Analysis of developing projects in the greater area and determination of current and future needs g. Development of a management model and its application to the specific River Basin District, h. Gathering of economic information related to developing activities in the area,i. Development and evaluation of an Economic Model, j. Development and evaluation of transboundary river basin development projects for Aoos and Drinos rivers along the borders with Albania, k. Dissemination actions: workshops, training courses, internet site, documentation, manuals and capacity building, awareness creation, education courses and training on water saving methods.



EOI

The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools. It is elaborated in order to assist the Ministry of Development in the implementation of the Water Framework Directive (2000/60). The project includes the following: data collection, GIS development, recording of all water use activities, water demand assessments, developing of a model, economic assessment, river basin development projects etc



HYDROPLAN E.U.

Country: GREECE ,   Year: 2003 - 2006 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Sewage and Wastewater

view more

RFP

The global objective of the project is to demonstrate and disseminate a European knowledge management framework, for a procedure (HYDROPLAN) on sustainable asset management with integrated links to best available technologies.
The target is to provide a comprehensive framework tool to share knowledge and collaborate in the development of best management practices and technologies. These practices will then be taken into consideration for pragmatic, cost effective and objective master planning decisions in the European sewerage sector.In Greece the life cases were in Athens (EYDAP) and Thessalonica (EYATH) where the HYDROPLAN methodology was implemented. The objective is to develop an advanced management tool, which will be used in order to take cost effective and pragmatic decisions for the network of the pilot area. With the use of the management tool the Sewer Authorities are planning to improve the functionality of the network and program future investments with the best cost effective way.



EOI

The global objective of the project is to demonstrate and disseminate a European knowledge management framework, for a procedure (HYDROPLAN) with integrated links to best available technologies. In Greece the pilot cases were in Athens (EYDAP) and Thessalonica (EYATH). The objective of this assignment is to develop an advanced management tool to be used to cost effective and pragmatic decisions for the network and help the Authorities to program the future investments.



DETAILED DESIGN FOR RE-ESTABLISHMENT OF PROBLEMATIC SECTIONS OF NATIONAL ROAD TRIPOLI – KALAMATA, PELOPONNESE, GREECE (STA. 9+600 TO STA. 15+000)

Country: GREECE ,   Year: 2004 - 2005 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Storm Water Networks and Flood prevention

view more

RFP

The project involed the design of the water drainage system of the part of the new national road to Tsakona that was redesigned after the geological and geotechnical failure that caused the closure of the road. The new design of the road was altered involving a new tunnel and a valley bridge. Z&A was responsible for the hydraulic design of the project which included the water drainage system of the road and the storm water sewerage to prevent flooding from upstream catchments along with the design of the necessary hydraulic structures (ditches, culverts, etc).



EOI

The project involed the design of the water drainage system of the new national road to Tsakona that was redesigned after the geological and geotechnical failure that caused the closure of the road. The new design of the road was altered involving a new tunnel and a valley bridge. The hydraulic design of the project included the water drainage system of the road and the storm water network.



WATER MANAGEMENT STUDY FOR THE WATER SUPPLY NETWORK AND LEAKAGE CONTROL OF THE CITY OF HRAKLEIO (PHASE A')

Country: GREECE ,   Year: 2003 - 2005 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Non Revenue Water projects, Water Supply & Water Distribution

view more

RFP

Hrakleio is a city located in Crete island with a population of 305,000 people. DEYAI is the public (municipal) organization responsible for the water distribution and the sewerage networks of the greater Iraklio area. The main task of the project was the improvement of the financial and operational performance of the organization, especially concerning the department of the organization that is responsible for the water distribution networks. Detailed analysis and technical assistance were provided in terms of improving the management and business administration of DEYAI including advanced organization charts, implementation of new technology, human resources reformations, financial plans etc.
Also technical assistance was provided including diagnostic assessment of the water distribution network, development of a full GIS with all the appropriate databases and development of detailed hydraulic models for the entire network.
Finally technical assistance was provided concerning the adaptation of new technologies (new software and hardware, pipe detectors, leakage control instruments, SCADA systems, etc.) for improving the operation and control of the water distribution networks, including all the appropriate training of the employees.



EOI

The main task of the project was the assessment of the distribution network, development of a full GIS and development of detailed hydraulic models for the entire network of the city. Additionally technical assistance was provided concerning the adaptation of new technologies (new software and hardware, pipe detectors, leakage control instruments, SCADA systems, etc.) for improving the operation and control of the system, including all required training of the employees.