WATER SUPPLY STUDY AND DESIGN, AWARENESS CREATION AND CATCHMENT REHABILITATION FOR GEFFERSA, LEGEDADI AND DIRE CATCHMENT AREAS IN ETHIOPIA

WATER SUPPLY STUDY AND DESIGN, AWARENESS CREATION AND CATCHMENT REHABILITATION FOR GEFFERSA, LEGEDADI AND DIRE CATCHMENT AREAS IN ETHIOPIA

The consultant's scope of service is mainly divided into 6 components. These include: 1) Review of the master plan of the catchments, 2) Identification of stakeholders and clearly show the positive and negative impacts of the project on the stakeholders,


3) Conduct the awareness creation and design training mechanisms for the population in the catchments, stakeholders & collaborators and the AAWSA staffs in the responsible Department & the Management respectively, 4) Study and design of Water Supply Sources, 5) Study and design various technologies for catchment rehabilitation which includes the study and design of 17 dams, soil conservation measures, silt traps, buffer zones, etc., 6) Training the appropriate staff of AAWSA. Potential Hydropower production was examined.

More specifically, the following dams have been designed in a feasibility and detailed design phase:
i. On the Menjano Catchment: earth fill dam with clay core and apparent structures, H = 26.0 m.
ii. On the Doyo catchment: earth fill dam with clay core and apparent structures, H = 13.0 m.
iii. On the Legeberi catchment: earth fill dam with clay core and apparent structures, H = 13.0 m.
iv. On the Sendafa catchment: silt trap, H = 5.0 m.

z-a.gr - Bottom info

News & Events

  • Detail Design Study of the Chavria Irrigation Network

    June 2025. New Contract for Z&A in Greece related to Deisgn of irrigation network under the name ''Detail Design Study of the Chavria Irrigation Network''.
    The project to be studied in detail concerns the land improvement of 24,000 hectares of pure agricultural land, in a gross irrigable area of ​​approximately 26,600 hectares, in the Ormylia plain of South Chalkidiki -Greece.The photo is for the day of signing the contract with the Directorate of Flood Control and Land Improvement

    Photo Signing Contract Chavria Irrigation

    [more]
  • CONSULTANCY SERVICES FOR DETAILED DESIGNS AND CONSTRUCTION SUPERVISION OF BLANTYRE WATER SUPPLY NETWORK UPGRADES

    February 2024

    Z&A as the leading firm of a J/V signed a new Water Supply related contract in Malawi. The consulting services include detailed designs and construction supervision of Blantyre Water Supply network upgrades. The Consultancy assignment shall be conducted in two phases: Phase 1–detailed design and tender documentation; and Phase 2–construction supervision and DMA establishment and commissioning.
    The assignment shall be completed within a period of Fifty- Eight (58) calendar months.

    Phase 1 of the consultancy assignment is expected to be conducted over a period of Ten (10) months and Phase 2 over a period of 48 months ths includes 12 months’ defects liability period)

    Below the photo of Overview map of the Blantyre main water assets.

    The 3 intakes and Water Treatment Plants are:
    • Walkers Ferry intake on the Shire River and WTP.
    • Mudi Dam intake and WTP
    • Lokhubula River intake and Nguludi WTP

    Overview map of the Blantyre main water assets.

     

    [more]
  • CONSTRUCTION SUPERVISION OF THE WORKS AT THE EIGHT (08) DAMS AND PREPARATION OF OPERATION AND MAINTENANCE PLANS

    January 2024

    The Services to be provided by Z&A are organized in two part: Review the designs and ensure compliance with the technical specification and design solution of the works implemented by the contractor - Supervision of construction works and implementation of safeguard measures - Training activities for stakeholders such as dam committees and district local staff. 

    [more]
  • Postgraduate program "Management of Infrastructure and Construction Projects"- National Technical University of Athens - Greece

    DECEMBER 2023

    Z&A was invited and did a presentation as part of the postgraduate program "Management of Infrastructure and Construction Projects" that was launched thanks to the partnership between the National Technical University of Athens - School of Civil Engineering and the GEK TERNA Group, which will finance the program for five years with half a million euros.
    The MSc Program aims at the specialization of young engineers in the administration and management of infrastructure and construction projects, with the use of new technologies, in further analysing the modern scientific concepts and implementation of techniques related to all stages of the projects' life cycle

    ΕΜΠ ΔΙΑΛΕΞΗ 1

    ΕΜΠ ΔΙΑΛΕΞΗ 2

    [more]
  • PROVISION OF CONSULTING SERVICES FOR THE SUPERVISION OF THE CONSTRUCTION OF THE KAMMITSI AND ARCHANGELOS DAM

    IMG 20231129 WA0006

     

    The construction of the Kammitsi Dam (29,95 m height (from foundation), and Reservoir Capacity of 1.050.000 m3) in Cyprus continues. A visit by Z&A's Executive Director Mr Panos Antonaropoulos and Z&A's Technical Director Mr Aris Bakalis has taken place today to meet with the rest of Z&A's resident engineers and view real time the progress of works. Z&A is working closely with the client and the constructor for the successful completion of the project following Z&A’s core values Specialization, Integrity, and Excellence.

    IMG 20231129 WA0001

    [more]
  • PROVISION OF ADVISORY SERVICES FOR CONSTRUCTION OF THE WASTEWATER COLLECTION NETWORK AND THE WASTEWATER TREATMENT STATION IN THE CITY OF CHRYSOCHOUS

    Following the signing of the contract the assigment has now started. The first meeting and field visit took place on the 28th of November.

    First meeting Chrisohous

     

    Field 2 Chrisohous

    [more]
  • PROVISION OF ADVISORY SERVICES FOR CONSTRUCTION OF THE WASTEWATER COLLECTION NETWORK AND THE WASTEWATER TREATMENT STATION IN THE CITY OF CHRYSOCHOUS

    November 2023 New Contract was signed by Z&A's Executive Director, Mr Panos Antonaropoulos, as the leading company of a J/V in Cyprus regarding the The Wastewater Collection Network And The Wastewater Treatment Station In The City Of Chrysochous. The photos that follow are from the date of signing the new contract 1 CHRISOHOUS CONTRACT

     

    2 CHRISOHOUS CONTRACT

    [more]
  • CONSULTANCY SERVICES FOR FEASIBILITY STUDIES FOR AMAGORO IRRIGATION SCHEME IN TORORO DISTRICT

    On the 7th of November 2023 a successful completion of a workshop took place in Uganda. Photos are from the workshop with Mr Panos Antonaropoulos Executive Director of Z&A and Prof Michael Kavvadas the Geotechnical Expert of the Study.

     

    Presentation Nov 2023

    Mr Panos Antonaropoulos

     

    Kavvadas Presentation

    Prof Micahel Kavvadas

    Dam

    Following the succesfull workshop; on the 8th of November 2023, a Dam training session for junior engineers of MWE Uganda was held. In the photo that follows we can see both Mr Antonaropoulos and Prof Kavvadas on the day of the training

    Amagoro Training Photo

    [more]
  • E.U. DIRECTIVE 2000/60. 2ND REVISION OF RIVER BASIN MANAGEMENT PLANS OF THE 14 WATER DIVISIONS OF THE COUNTRY

    Ζ&A as leader of a J/V, in line with the requirements of the Framework Directive 2000/60/EC (Article 14) organised the public consultation in two different towns (Patras 20 Oct 2023, Kalamata 26 Oct 2023) under the project 2ND REVISION OF RIVER BASIN MANAGEMENT PLANS OF THE 14 WATER DIVISIONS OF THE COUNTRY. Two more meetings will be held . The first one in Corfu (02 Nov 2023) and the second one in Nafplio (10 Nov 2023).

    Z&A was represented by Mr Panos Antonaropoulos (Coordinator-Team Leader), Mrs Irene Sakellari (Hydrologist) and Mr Ioannis Katsaros (Hydrogeologist)

    Antonaropoulos

    On the right: Mr Panos Antonaropoulos

    Doc3

    On the right: Mrs Irene Sakellari

    [more]
  • PROVISION OF DESIGN CONSULTANT SERVICES FOR (A) ADDITIONAL AND NEW STUDIES, (B) PREPARATION OF TENDER DOCUMENTS FOR THE ANNOUNCEMENT OF TENDERS, (C) EVALUATION OF BIDS, (D) SUPERVISION OF THE CONSTRUCTION WORKS OF THE SEWAGE SYSTEM IN GOVERNMENT SETTLEME

    On the 15th of September 2023 Z&A attended the Contract Signing Ceremony of the Contractor for the Construction Phase of the Assigment PROVISION OF DESIGN CONSULTANT SERVICES FOR
    (A) ADDITIONAL AND NEW STUDIES, (B) PREPARATION OF TENDER DOCUMENTS FOR THE ANNOUNCEMENT OF TENDERS, (C) EVALUATION OF BIDS, (D) SUPERVISION OF THE CONSTRUCTION WORKS OF THE SEWAGE SYSTEM IN GOVERNMENT SETTLEMENTS AND SELF-HOUSING SETTLEMENTS IN LIMASSOL, (E) SUPERVISION OF WORKS WITHIN THE RESIDENCES. Z&A will be supervising the works. Aris at SALA for the Contract

    Mr Aris Bakalis, represented Z&A in the CeremonyAris at SALA for the Contract 2